High reliable Go kart parts components 219 sprockets made in China
Product Name | OEM Go Kart Parts |
Tolerance | +/-0.01mm, 100% QC quality inspection before delivery, can provide quality inspection form. |
MOQ | To be negotiated |
Sample Cost | Can be Refunded when You Have Official Bulk Order. |
Delivery Time | 1-30 days after order with prepayment based on product structure and quantity. |
Main Materials
Stainless Steel | SS201,SS301,SS303, SS304, SS316, SS416 etc. |
Steel | mild steel, Carbon steel, 4140, 4340, Q235, Q345B, 20#, 45#, etc. |
Brass | HPb63, HPb62, HPb61, HPb59, H59, H68, H80, H90 etc. |
Copper | C11000,C12000,C12000, C36000 etc. |
Aluminum | AL6061, Al6063, AL6082, AL7075, AL5052, A380 etc. |
Iron | A36, 45#, 1213, 12L14, 1215 etc. |
Plastic | ABS, PC, PE, POM, Nylon, PP, Peek, etc. |
Surface Treatment
Stainless Steel | Polishing, Passivating, Sandblasting, Laser engraving |
Steel | Zinc plating, Oxide black, Nickel plating, Chrome plating, Carburized, Powder Coated. |
Aluminum parts | Clear Anodized, Color Anodized, Sandblasted Anodized, Chemical Film, Brushing, Polishing. |
Plastic | Plating gold (ABS), Painting, Brushing (Acrylic), laser engraving |
Technical Support
TONGBAO Group is a professional at independent development and design. Our engineers are skilled at AUTO CAD, PRO ENGINEER, SOLID, SketchUp. 3D max WORKS and other 2D & 3D software. We are able to design, develop, produce and deliver your PO according to your drawings, samples, or just an idea. control of non-standard products and OEM products.
Quality Control
1) Checking the raw material after they reach our factory------- Incoming quality control ( IQC)
2) Checking the details before the production line operated
3) Have a full inspection and routing inspection during mass production---In-process quality control(IPQC)
4) Checking the goods after they are finished---- Final quality control(FQC)
5) Checking the goods after they are finished-----Outgoing quality control(QC)